S. CHURCH STREET AND E. PENNSYLVANIA AVENUE WATER LINE AND STORMWATER IMPROVEMENTS
The construction work to install storm drainage structures along E. Pennsylvania Ave. was temporarily delayed due to the discovery of a previously unmapped utility. That issue has been resolved, and work will resume this week, beginning Wednesday, November 2nd. Work is anticipated to continue until mid-December. Road closure updates:
E. Pennsylvania Avenue between S. Church Street and S. Light Street will remain closed Monday-Friday, 7am to 6pm. For your safety, both vehicles and pedestrians are asked to avoid the area during these hours. Parking, for businesses impacted by the road closure, is available behind and across from Willow’s Vintage Charm on Church Street.
Town staff will continue to work onsite, but for safety reasons, the Town Administrative building and parking lot are also closed to the public except for appointments during this time. To schedule an appointment, contact the Town Office at (540) 822-5788. Payments may be deposited in the drop box near the museum outside of construction hours. Parking for the Municipal Complex is available behind Willow’s Vintage Charm on S. Church Street. In addition, other sections of E. Pennsylvania Avenue may be closed intermittently as needed. The contractor will work to mitigate impacts as much as possible.
Thank you in advance for your patience. Contact Jean LaPadula at [email protected] or 571-509-9694 for additional information.
S. LOUDOUN AND S. LOCUST STREETS PEDESTRIAN IMPROVEMENTS
The Town of Lovettsville is in the process of designing planned improvements to South Loudoun Street and South Locust Street between the Lovettsville Elementary School and East Broad Way. Improvements will include installing sidewalks, improved storm drainage, and minor roadway improvements to address speed and vehicular safety. Americans with Disabilities Act (ADA) compliant sidewalks will provide safe pedestrian access along the corridor from the center of Town. The project will also include making South Loudoun Street one-way southbound between East Broad Way and South Locust Street, consistent with the Town-wide Transportation Plan. Additionally, inadequate storm drainage and high speeds along the corridor will be addressed with the implementation of this project. The Town received $2 Million in Loudoun County grant funds and $5,744,100 in Virginia Department of Transportation (VDOT) funds that will go towards the anticipated total project cost of $7,904,100
The Town of Lovettsville has requested Kimley-Horn’s assistance to support in completing the analysis and design.
2022_05_10_S Loudoun and Locust_Presentation Kimley-Horn
2022-02-23_Lovettsville-Loudoun Street One-Way Analysis abridged pages 1-4
Kimley-Horn delivered 30% design drawings on December 22, 2022 and the Town provided comments on January 13, 2023.
The Town is looking to gain feedback on the 60% drawings, dated June 23, 2023, from property owners along the project corridor, as well as local stakeholders. Comments and/or suggestions may be submitted via mail (PO Box 209), email ([email protected]), by completing the online form, or in person at Town Hall. Please submit all comments by Thursday, November 2, 2023.
A public hearing is scheduled for Thursday, October 12, 2023 from 5:00pm-6:30pm in Town Council Chambers located at 6 E. Pennsylvania Avenue, Lovettsville, VA 20180. The purpose of the public hearing is to provide information, answer questions, and obtain feedback and suggestions.
In addition, you can subscribe to receive project design and construction updates via email/text by completing the online form.
OLD TOWN ONE-WAY CONVERSION REVIEW
The review is included in the Transportation Master Plan (TMP): “Explore one-way conversions on narrow streets in the Old Town area. The goals of the review and possible conversion include increasing mobility choices, increasing safety, preserving infrastructure, improving drainage, replacing and upgrading utilities, and enhancing traffic flow and access to adjacent properties.”
The Town Council approved a contract with Wells + Associates to conduct a review and provide recommendations on June 8, 2023. They presented options to the public at the Infrastructure Committee meeting on August 8, 2023, and received input and feedback from residents and business owners. Town staff met with the consultant to discuss possible modifications to address public comments.
23.0912 – Lovettsville One-way Review – Proposed E. Penn Ave., S.Church, and S. Light St. Designs
The modified designs will be presented to the Infrastructure Committee on September 12, 2023, and a public hearing is scheduled for September 28, 2023.
Contact Jean LaPadula at [email protected] or 571-509-9694 with comments or questions.
TOWN OF LOVETTSVILLE
PROJECT UPDATE
EAST BROAD WAY 2A STREETSCAPE IMPROVEMENTS
Status: The 90% project design documents are currently under review by the Virginia Department of Transportation (VDOT). Pending VDOT approval, construction is planned to begin no sooner than June 2024.
The Town’s Consultant, Volkert, Inc. is assessing affected properties and will be contacting property owners regarding the acquisition of right-of-way construction access. If you have any questions or concerns, contact the Town’s Project Manager, Charlie Mumaw PE at [email protected] or 540.755.3005.
In accordance with the statutes of the Commonwealth of Virginia, and policies of the Commonwealth Transportation Board, LOVETTSVILLE TOWN COUNCIL held a public hearing on April 27, 2023 at 5:30 pm in the Town Council Chamber, 6 E. Pennsylvania Avenue, Lovettsville, Virginia on the Town’s East Broad Way 2A Streetscape Improvements project and the associated project design, tentative project schedule, environmental document and right-of-way requirements.
Lovettsville_E Broad Way Public Hearing PowerPoint
The project includes public improvements comprised of sidewalks, curb, gutter, streetlights, storm drainage, on-street parking spaces and landscaping, storm water management and drainage, waterline replacement, and pedestrian and vehicular safety in the corridor of East Broad Way from South Loudoun Street to South Church Street. Additional details concerning the project including design plans, schedule and funding are available for review at the Town Hall between the hours of 8:30am and 4:30pm weekdays or by special appointment, holidays excepted.
The Town of Lovettsville ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact the Town of Lovettsville at (540) 822-5788.
STATE PROJECT: EN18-255-290, P101 TAP-5B01(024), R201 TAP-5B01(287), C501 TAP-5B01(480)
UPC No: 113840